top of page
< Back

Combined Thermal + H2S Downhole Elastomer Aging Prediction

CNPC spent $180,000 and 6 months to find out their sealant would survive 5 years downhole. K-Load gave the same answer in 35 days. Same accuracy. One-fifth the cost.

✅ 95% prediction accuracy — CNPC oil well sealant, 5-year horizon | ⏱ 35 days to simulation result vs. 6 months of physical testing | 💰 Validated: FEPM (AFLAS 150S), FKM (Viton GF-S), HNBR (Zetpol 2010)

Thermal + H2S Downhole Elastomer Aging | K-Load | Karax
Thermal + H2S Downhole Elastomer Aging | K-Load | Karax
Predict elastomer life under combined HPHT temperature and H2S attack. FEPM (AFLAS 150S), FKM (Viton GF-S), HNBR (Zetpol 2010). CNPC 95% accuracy. Free trial.
bottom of page